Eligible Costs | Non-Eligible Costs |
For Charging Equipment Incentive | Land/parking space purchase or lease
|
A console wired into the electrical supply | Software subscription and warranty
|
A cable and connector to plug into the EV
| Taxes
|
Cable management strategy (e.g., coil, retractable, etc.)
| Internet connection or cell signal
|
Mounting, either pedestal or wall. Pedestal: hard-wired to a permanent pole or box. Wall: hard-wired to a wall and typically includes a mounting plate.
| Planning or permitting for the project
|
Separate payment module
| Bollards, curbs, wheel stops, setbacks, bumper guards
|
Shipping/Freight for eligible charging equipment costs
| Electricity consumption, demand and meter charges
|
For Installation Incentive | Preventative and corrective maintenance on EV charging station
|
Customer electrical infrastructure: electrical make ready and branch wiring
| Upgrading or adding new utility electric supply equipment, including 2nd transformer or line extensions if needed.[1]
|
Labor to bring stations to electrical code
| Shipping/Freight for non-eligible costs
|
Electrical materials: conduit, fittings, wire, electrical equipment
| Others as determined by CMLP
|
Construction costs related to installation (including ADA EV parking space if required by MassEVIP)
|
|
Signage and pavement painting
|
|
Shipping/freight for eligible installation costs. |
|