News Flash Home
The original item was published from 9/15/2021 8:32:42 AM to 10/1/2021 12:00:06 AM.

News Flash

News and Notices

Posted on: September 15, 2021

[ARCHIVED] Construction Advisory - Main St. Sidewalk between Belknap and Academy

Please be advised that localized construction will commence on Main Street sidewalk between Belknap Street and Academy Lane on Wednesday, September 15, 2021 and will continue through the end of the month.  Concord Academy has undertaken this project that entails removing the existing stone dust walk surface and installing new concrete sidewalks. Two-way vehicular traffic will be maintained, however, expect localized delays and no on-street parking near construction crews (signs will be posted).  The sidewalk will be closed in this area and pedestrians will be redirected across Main Street to continue traveling down Main Street.

Additional information can be obtained by contacting CPW- Engineering Division 978-318-3210.

Facebook Twitter Email

Other News in News and Notices

Draft Historic Preservation Plan Released for Public Comment

Posted on: April 3, 2026 | Last Modified on: April 3, 2026

Official Town Election Results

Posted on: April 2, 2026

Unofficial Town Election Results

Posted on: April 1, 2026

PSA: Be Aware of Email Phishing Scam

Posted on: March 31, 2026
FY27 Budget Book:  street scene with green and blue graphic details

FY27 Budget Book Available On-Line

Posted on: February 19, 2026

Information: Residential Property Tax Exemption

Posted on: November 24, 2025 | Last Modified on: November 24, 2025