Planning Board Current Meeting Documents
Documents are posted for informational purposes only as staff time allows. The official public record with all related documents is maintained in the Planning Division office at 141 Keyes Rd.
Town Offices are closed
In order to help protect our Town employees and the community, the Town is only operating essential services until further notice and all municipal buildings are closed to the public. Public Safety, public works, public health services and application filings are not impacted by this limited closure. If you are looking for information or have a question related to board/committee or department operations, please don’t leave a voice message, but email Planning@concordma.gov or visit the Town’s website at www.concordma.gov Planning Board, Zoning Board of Appeals, Historic Districts Commission and Historical Commission applications will be accepted via a Drop Box outside the front door of the Department of Planning and Land Management building at 141 Keyes Road. Please note that roll plans are not able to be accepted at this time and should be submitted via a flash drive or USB drive. Please place drive in an envelope with the address or project clearly noted. Application materials smaller than 10MB may be emailed to Planning@concordma.gov. For information on COVID-19 and the Town’s response, please visit www.concordma.gov/coronavirus2019 We encourage you to sign up for News and Notices for emailed information or follow the Town on social media – instructions are on the homepage.
Items for April 13 meeting
- MGL CH61A Notice of Intent to Sell Parcel 1371-4, Monument Street
- Concord Thoreau Depot MAPC Presentation 04.13.21
- Draft MAPC Concord Thoreau Depot Zoning 04.13.21
- Concord Thoreau Depot_Design Guidelines_2021.03.17
- WestMetro Home Consortium Fair Housing Workshop Flyer
- Form A ANR 130 Old Stow Rd & 6 Hillside Ave
- Approval Not Required Plan -130 Old Stow Rd & 6 Hillside Ave
Please visit the Planning Board's Goals and Projects page to view the previous presentations and documents for the Thoreau Depot Redevelopment Project: https://concordma.gov/2193/Planning-Board-Goals-Projects.
Site Plan Review - VOA Concord Park Assisted Living - 68 Commonwealth Ave - May 4, 2021
- 68 Commonwealth Ave - Site Plan Review Cover Letter 4-6-21
- 68 Commonwealth Ave - Site Plan Review Application
- 68 Commonwealth Ave - Site Plan Review Site Sign Lighting
- 68 Commonwealth Ave - Site Plan Review Revised Sign Lighting
- 68 Commonwealth Ave - Site Plan Review - Canopy
- 68 Commonwealth Ave - Site Plan Review - Canopy Lighting Memo 12.16.20
- 68 Commonwealth Ave - Site Plan Review - Canopy Linear Fixture
- 68 Commonwealth Ave - Site Plan Review - Canopy-Reduced-11x17
- 68 Commonwealth Ave - Site Plan Review ANSI_IES-RP-28-16-Errata-1_020118
- 68 Commonwealth Ave - Site Plan Review SI-10R Exterior Canopy Upgrades
- 68 Commonwealth Ave - Site Plan Review SI-10R Exterior Canopy Upgrades Reduced 11x17
- 68 Commonwealth Ave - Site Plan Review TMA Access and Utility Easement Plan
- 68 Commonwealth Ave - Site Plan Review Off Site Entrance Improvements 4-8-21
Site Plan Review - Concord Children's Center - 250 Old Bedford Rd - May 4, 2021
- 250 Old Bedford Rd Concord Children's Center Site Plan Review Application
- 250 Old Bedford Rd Concord Childrens Center Site Plan Application pg. 3 revised 4-12-21
- 250 Old Bedford Rd Concord Children's Center Site Plan
- 250 Old Bedford Rd Concord Children's Center Stormwater Report 3-30-21
- 250 Old Bedford Rd Concord Children's Center Drainage Maps rev2
- 250 Old Bedford Rd Concord Children's Center Traffic Study 2-10-21
- 250 Old Bedford Rd Concord Children's Center Traffic Study Appendix
Definitive Subdivision Plan Public Hearing - 48Y Fitchburg Turnpike - June 8, 2021.
- 48Y Fitchburg Turnpike Definitive Subdivision - Application Package 9-11-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Civil Plans 9-8-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Stormwater Report 9-4-20
- 48Y Fitchburg Turnpike Definitive Subdivision - CPW Engineering Div. Comments 9-29-20
- 48Y Fitchburg Turnpike Definitive Subdivision - CPW Water Sewer Div. Comments 10-1-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Board of Health letter 10-15-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Fire Dept. Comment Letter 10-21-20
- 48Y Fitchburg Turnpike Definitive Subdivision - CMLP 10.23.20
- 48Y Fitchburg Turnpike Definitive Subdivision - Town Planner's Report 11-9-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Applicant's Response to Planner's Report 12-22-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Plan Sheets 1-6 revised 12-17-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Fire Truck Circulation Sheet
- 48Y Fitchburg Turnpike Definitive Subdivision - Construction Detail Sheet revised 12-17-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Stormwater Report revised 12-17-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Trip Generation Table submitted 12-22-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Applicant's Traffic Analysis 12-24-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Police Department Comment Letter 12-24-20
- 48Y Fitchburg Turnpike Definitive Subdivision - Fire Dept. Comment Letter 1-4-21
- 48Y Fitchburg Turnpike Definitive Subdivision - Fire Truck Circulation Plan
- 48Y Fitchburg Turnpike Definitive Subdivision - CPW Engineering Div. Comments #2 1-6-21
- 48Y Fitchburg Turnpike Definititve Subdivision - CMLP Response Letter 1-9-21
- 48Y Fitchburg Turnpike Definitive Subdivision - Extension form to 2.25.21
- 48Y Fitchburg Turnpike Definitive Subdivision - Extension form to 3.26.21
- 48Y Fitchburg Turnpike Definitive Subdivision - Extension form to 6.18.21