As part of the 2023 Road Improvement Project, Engineering staff advertised three (3) separate contracts listed below:
- Phase I - pavement preservation with bonded wearing surface
- Phase II - pavement preservation and rehabilitation that includes fog sealing, micro surfacing, and cold in-place recycling
- Phase III - pavement reconstruction that includes full depth reconstruction and milling and overlay
Bids for Phase I were opened on June 26, 2023. Engineering staff analyzed the bid tenders and recommended that no award be made for this contract. Bids received were significantly higher than what was anticipated. It was found that the Incidental bid items related to this preservation treatment significantly increased the overall cost to conduct this work.
Bids for Phase II were opened on June 26, 2023. Engineering staff analyzed the bid tenders and determined that the bids received for the Micro-surfacing preservation portion of this contract were higher than expected, therefore no award will be made for this treatment. However, Engineering awarded the fog sealing portion of this contract to Indus, D/B/A Seal Coating Inc. as bid received came in as expected. Due to warm dry weather needed to conduct fog sealing, this work has been scheduled for the spring of 2024. List of streets to receive fog seal preservation treatment are listed below.
Bids for Phase III were opened on July 26, 2023. Bids received for this contract were significantly less than anticipated, therefore Engineering recommended the town award the full contract amount to the lowest bidder, Lazaro Paving Corporation. The Work under this contract consists of Milling, reclamation, and paving of various streets. Streets to be paved are listed in the table below. Lazaro completed the milling and paving of Old Marlboro Road and Old Pickard and the reclamation and paving binder of the butternut neighborhood. The remaining work that was not completed during the 2023 construction season is scheduled to be completed in the spring of 2024.
The 2023 Roads Improvement Program will include the following streets and treatments.
Roads selected for fog sealing(phase II):
Street Name | Roadway Treatment Limits | Treatment Type | Road Length (FT) | |
From | To | |||
Baker Avenue | Main Street | Dead End | Fog Seal | 1,765 |
Baker Avenue Ext | Baker Ave | Route 2 | Fog Seal | 2,275 |
Old Marlboro Road | Harrington Ave | Old Road | Fog Seal | 4,800 |
Dee Road | Main Street | Dead End | Fog Seal | 402 |
Sudbury Road | 2000’ S of Rte 2 | 200’ S of Seven Star Lane | Fog Seal | 4,100 |
Laurel Street | Thoreau St | Stow St | Fog Seal | 1,090 |
Shadyside Avenue | Lincoln Town Line | Dead End | Fog Seal | 3,040 |
Alcott Road | Lexington Road | Independence Road | Fog Seal | 1,840 |
Independence Road | Alcott Road | Alcott Road | Fog Seal | 3,160 |
TOTAL(Miles)= | 4.3 | |||
Roads Selected for Rehabilitation(phase III)
Street Name | Roadway Treatment Limits | Treatment Type | Road Length (FT) |
| ||
From | To |
| ||||
Walden Street | Heywood St | 300’ N of Thoreau St | Mill and Overlay | 2,790 |
| |
Old Rd North | Wolf Pine Way | 465’ S of Rte. 2 | Mill and Overlay | 3,482 |
| |
Old Rd South | Rollingwood Ln | Sudbury Rd | Mill and Overlay | 2,182 |
| |
Davis Ct | Bedford St | Dead End | Mill and Overlay | 525 |
| |
Mattison Dr | Williams Rd | Loop | Reclamation | 4024 |
| |
Alford Circle | Mattison Dr | Cul-de-sac | Reclamation | 882 |
| |
Ayrshire Lane | Mattison Dr | Cul-de-sac | Reclamation | 987 |
| |
Macmillan Dr | Mattison Dr | Cul-de-sac | Reclamation | 683 |
| |
Main Street | Cottage St | 200’ W of Pine Street | Mill and Overlay | 2,046 |
| |
Main St | 200’ W of Pine Street | Damon Mill Bridge | Mill and Overlay | 3,850 | ||
Pine Street | Main Street | Bridge | Mill and Overlay | 1285 | ||
Central Street | West St | Pine Street | Mill and Overlay | 857 | ||
Old Pickard Rd | Sudbury Town line | Old Marlboro Road | Mill & Overlay | 3,290 | ||
Old Marlboro Road | Sudbury Town line | Old Pickard Road | Mill & Overlay | 3,821 | ||
Fairyland Parking Lot | Fairyland Parking Lot | Reclamation | N/A | |||
TOTAL(miles) | 6 | |||||